Information for |
|
| Saginaw WWTP - NPDES Permit#: MI0025577 | |
Permittee: | Saginaw |
Permit Issue Date: | 12/6/2002 |
Permit Expiration Date: | 10/1/2010 |
Long-Term Control Program Description: | Long-term Control Program being implemented; upgrades for two of the "RTBs" (Weiss St. RTB & 14th St. RTB) in order to provide for adequate treatment of all overflows has been completed; in accordance with the permit & approved program, permittee is re-conducting a Retention/Treatment Basin Evaluation Studies for the "East Side" system and "West Side" system to determine whether these facilities provide adequate treatment and whether facility upgrade will be required; the original studies were not approvable. |
| View Events Logged For This Permittee | |
| Discharge Locations: | |
Outfall Number: | 003R (Retention Treatment Basin) |
Outfall Location: | Weiss Street |
County: | Saginaw |
Receiving Water: | Saginaw River |
Current Treatment Provided: | 9.5 MG Retention Treatment Basin, primary sedimentation, skimming, disinfection |
CSO Permit Requirements: | Retention for treatment of 1 yr., 1 hr. storm event, primary treatment up to 10 yr. 1 hr. storm w/ 30 min. detention |
Outfall Number: | 004 (Gate operated regulator) |
Outfall Location: | Emerson Street Pump Station |
County: | Saginaw |
Receiving Water: | Saginaw River |
Current Treatment Provided: | none |
CSO Permit Requirements: | Now closed, wont be used unless flooding |
Outfall Number: | 004R (Retention Treatment Basin) |
Outfall Location: | Emerson Street |
County: | Saginaw |
Receiving Water: | Saginaw River |
Current Treatment Provided: | Primary sedimentation, skimming, disinfection |
CSO Permit Requirements: | Provide retention of 1/2" one hour storm, 2/3 will be provided for settling skimming disinfection (Phase A) |
Outfall Number: | 005 (Gate operated regulator) |
Outfall Location: | Hancock Street Pump Station |
County: | Saginaw |
Receiving Water: | Saginaw River |
Current Treatment Provided: | none |
CSO Permit Requirements: | Now closed, wont be used unless flooding |
Outfall Number: | 005R (Retention Treatment Basin) |
Outfall Location: | Hancock Street |
County: | Saginaw |
Receiving Water: | Saginaw River |
Current Treatment Provided: | 3.5 MG Retention Treatment Basin, primary sedimentation, skimming, disinfection |
CSO Permit Requirements: | |
Outfall Number: | 006 (Gate operated regulator) |
Outfall Location: | Webber Street Pump Station |
County: | Saginaw |
Receiving Water: | Saginaw River |
Current Treatment Provided: | none |
CSO Permit Requirements: | Now closed, wont be used unless flooding |
Outfall Number: | 006R (Retention Treatment Basin) |
Outfall Location: | Webber Street |
County: | Saginaw |
Receiving Water: | Saginaw River |
Current Treatment Provided: | Primary sedimentation, skimming, disinfection |
CSO Permit Requirements: | Provide retention of 1/2" one hour storm, 2/3 will be provided for settling skimming disinfection (Phase A) |
Outfall Number: | 007 (Gate operated regulator) |
Outfall Location: | 14th Street Pump Station |
County: | Saginaw |
Receiving Water: | Saginaw River |
Current Treatment Provided: | none |
CSO Permit Requirements: | Now closed, wont be used unless flooding |
Outfall Number: | 007R (Retention Treatment Basin) |
Outfall Location: | 14th Street |
County: | Saginaw |
Receiving Water: | Saginaw River |
Current Treatment Provided: | 3.5 MG Retention Treatment Basin, primary sedimentation, skimming, disinfection |
CSO Permit Requirements: | Retention for treatment of 1 yr., 1 hr. storm event, primary treatment up to 10 yr. 1 hr. storm w/ 30 min. detention |
Outfall Number: | 011R (Retention Treatment Basin) |
Outfall Location: | Fitzhugh Street |
County: | Saginaw |
Receiving Water: | Saginaw River |
Current Treatment Provided: | Primary sedimentation, skimming, disinfection |
CSO Permit Requirements: | Provide retention of 1/2" one hour storm, 2/3 will be provided for settling skimming disinfection (Phase A) |
Outfall Number: | 026 (Regulator) |
Outfall Location: | Mackinaw Street, 1250' of Court Street Bridge |
County: | Saginaw |
Receiving Water: | Saginaw River |
Current Treatment Provided: | none |
CSO Permit Requirements: | Eliminated with Salt Fraser Phase B, construction permit issued 4/2/99 |
Outfall Number: | 027 (Regulator) |
Outfall Location: | Van Buren Street, 950' South of Court Street Bridg |
County: | Saginaw |
Receiving Water: | Saginaw River |
Current Treatment Provided: | none |
CSO Permit Requirements: | Eliminated with Salt Fraser Phase B, construction permit issued 4/2/99 |
Outfall Number: | 028 (Regulator) |
Outfall Location: | Cass Street, 650' South of Court Street Bridge |
County: | Saginaw |
Receiving Water: | Saginaw River |
Current Treatment Provided: | none |
CSO Permit Requirements: | Eliminated with Salt Fraser Phase B, construction permit issued 4/2/99 |
Outfall Number: | 030 (Regulator) |
Outfall Location: | Ames Street, 600' North of Court Street Bridge |
County: | Saginaw |
Receiving Water: | Saginaw River |
Current Treatment Provided: | none |
CSO Permit Requirements: | Eliminated with Hancock Phase B, currently under construction |
Outfall Number: | 031 (Regulator) |
Outfall Location: | Adams Street, 350' South of Court Street Bridge |
County: | Saginaw |
Receiving Water: | Saginaw River |
Current Treatment Provided: | none |
CSO Permit Requirements: | Eliminated with Salt Fraser Phase B, construction permit issued 4/2/99 |
Outfall Number: | 032 (Regulator) |
Outfall Location: | Cleveland Street, 950" North of Court Street Bridg |
County: | Saginaw |
Receiving Water: | Saginaw River |
Current Treatment Provided: | none |
CSO Permit Requirements: | Eliminated with Hancock Phase B, currently under construction |
Outfall Number: | 034 (Regulator) |
Outfall Location: | Hayes Street, 2250 North of Court Street Bridge |
County: | Saginaw |
Receiving Water: | Saginaw River |
Current Treatment Provided: | none |
CSO Permit Requirements: | Eliminated with Hancock Phase B, currently under construction |
Outfall Number: | 035 (Regulator) |
Outfall Location: | Throop Street, 2400' North of Court Street Bridge |
County: | Saginaw |
Receiving Water: | Saginaw River |
Current Treatment Provided: | none |
CSO Permit Requirements: | Eliminated with Hancock Phase B, currently under construction |
Outfall Number: | 037R (Retention Treatment Basin) |
Outfall Location: | Salt/Fraser Street |
County: | Saginaw |
Receiving Water: | Saginaw River |
Current Treatment Provided: | Primary sedimentation, skimming & disinfection |
CSO Permit Requirements: | Provide retention of 1/2" one hour storm, 2/3 will be provided for settling skimming disinfection (Phase A) |
Outfall Number: | 039 (Regulator) |
Outfall Location: | Court Street at Court Street Bridge |
County: | Saginaw |
Receiving Water: | Saginaw River |
Current Treatment Provided: | none |
CSO Permit Requirements: | Eliminated with Salt Fraser Phase B, construction permit issued 4/2/99 |
Outfall Number: | 040 (Regulator) |
Outfall Location: | W. Bristol Street, 500' North of Remington Street |
County: | Saginaw |
Receiving Water: | Saginaw River |
Current Treatment Provided: | none |
CSO Permit Requirements: | Eliminated with Hancock Phase B, currently under construction |