Link to MDEQ Home Link to Michigan.gov

Information for
Niles WWTP

Niles WWTP - NPDES Permit#: MI0023701

Permittee:

Niles

Permit Issue Date:

9/25/2003

Permit Expiration Date:

10/1/2007

Long-Term Control Program Description:

Long-term Control Program (sewer separation project) completed. Facility was unable to certify that the project meets the performance requirements and is in negotiation with the Department to develop a Corrective Action Plan.

View Events Logged For This Permittee
Discharge Locations:

Outfall Number:

002 (Retention Basin)

Outfall Location:

WWTP

County:

Berrien

Receiving Water:

St. Joseph River

Current Treatment Provided:

primary sedimentation & disinfection

CSO Permit Requirements:

Permit Effluent Limitations


Outfall Number:

004

Outfall Location:

Eagle Street

County:

Berrien

Receiving Water:

St. Joseph River

Current Treatment Provided:

none

CSO Permit Requirements:

No overflow at 10yr/1hr storm


Outfall Number:

005

Outfall Location:

Howard Street

County:

Berrien

Receiving Water:

St. Joseph River

Current Treatment Provided:

none

CSO Permit Requirements:

No overflow at 10yr/1hr storm


Outfall Number:

006

Outfall Location:

Cass Street

County:

Berrien

Receiving Water:

St. Joseph River

Current Treatment Provided:

none

CSO Permit Requirements:

No overflow at 10yr/1hr storm


Outfall Number:

007

Outfall Location:

Sycamore Street

County:

Berrien

Receiving Water:

St. Joseph River

Current Treatment Provided:

none

CSO Permit Requirements:

No overflow at 10yr/1hr storm


Outfall Number:

008

Outfall Location:

Main Street

County:

Berrien

Receiving Water:

St. Joseph River

Current Treatment Provided:

none

CSO Permit Requirements:

No overflow at 10yr/1hr storm


Outfall Number:

009

Outfall Location:

Cedar Street

County:

Berrien

Receiving Water:

St. Joseph River

Current Treatment Provided:

none

CSO Permit Requirements:

No overflow at 10yr/1hr storm


Outfall Number:

010

Outfall Location:

Broadway Street

County:

Berrien

Receiving Water:

St. Joseph River

Current Treatment Provided:

none

CSO Permit Requirements:

No overflow at 10yr/1hr storm


Return to CSO/SSO Home Page


Michigan.gov Home   |  DEQ_Home  |   Online Services  |   Permits  |   Programs  |   Contact_DEQ
State Web Sites  |   Privacy Policy  |   Link Policy  |   Security Policy