Link to MDEQ Home Link to Michigan.gov
Michigan.gov Home DEQ Home | Michigan Air Permits System Home

 


Michigan Air Permits System
ROP Public Notice Documents

For a complete list of all permit documents (draft, final and proposed) that are currently available see the "Renewable Operating Permit Program Documents" page.

Overview of the Renewable Operating Permit Program


The Department of Environmental Quality is seeking comment on the following Renewable Operating Permit (ROP) actions:

Please note that if a particular application cannot be opened or is not available, it is because that application was submitted using older customized software that is not readable by the public.  To receive a copy of those applications, please contact the District Office identified in the Public Notice.

General Motors Tech Center, Warren - SRN:  B4049
The Department is holding a public comment period from January 20, 2012 until February 22, 2012 on proposed Permit to Install (PTI) number 160-11.  This comment period provides for future incorporation of the final PTIs into ROP No. MI-ROP-B4049-2009 as administrative amendment.

NSR Public Notice Documents

  • Draft Permit Terms and Conditions
  • Notice of Hearing
  • Fact Sheet
  • Company Letter
  • Interested Party Letter

Toyota Motor Engineering & Manufacturing - SRN:  N2915
The Department is holding a public comment period from January 16, 2012 until February 15, 2012 on a draft renewal of the ROP.

  • Public Notice - View
  • Staff Report - View
  • Draft ROP - View
  • Malfunction Abatement Plan - View

McLaren Performance Technologies - SRN:  A8217
The Department is holding a public comment period from January 16, 2012 until February 15, 2012 on a draft renewal of the ROP.

  • Public Notice - View
  • Staff Report - View
  • Draft ROP - View
  • Renewal Application - View

Paulstra CRC Corporation - SRN:  E5094
The Department is holding a public comment period from January 16, 2012 until February 15, 2012 on a draft renewal of the ROP.

  • Public Notice - View
  • Staff Report - View
  • Draft ROP - View
  • Renewal Application - View
  • Dust Collection System Preventative Maintenance Inspection Form - View
  • Mixing / Preform Maintenance Inspection Form - View
  • Wheelabrator 1 & 3 Monthly Inspection Form - View

General Motors LLC, Flint Engine - SRN:  B1607
The Department is holding a public comment period from December 19, 2011 until January 19, 2012 on a draft renewal of the ROP.

  • Public Notice - View
  • Staff Report - View
  • Draft ROP - View
  • Renewal Application - View

DTE Energy - SRN:  B2816
The Department is holding a public comment period from December 19, 2011 until January 18, 2012 on proposed Permit to Install (PTI) number 93-09B.  This comment period provides for future incorporation of the final PTIs into ROP No. MI-ROP-B2816-2009 as administrative amendment.

NSR Public Notice Documents

  • Draft Permit Terms and Conditions
  • Notice of Hearing
  • Fact Sheet
  • Company Letter
  • Interested Party Letter

Lafarge Midwest, Inc. - SRN:  B1477
The Department held a public comment period from November 7, 2011 until December 15, 2011 on a draft renewal of the ROP.  A public hearing was held on December 15, 2011.

  • Public Notice - View
  • Staff Report - View
  • Draft ROP - View
  • Clinker Outdoor Storage Fugitive Dust Plan - View
  • Facility Fugitive Dust Control Plan - View
  • Quarry Operations Start-up/Shutdown/Malfunction Abatement Plan - View
  • FG Quarry Operation & Maintenance Plan - View
  • Standard Operating Procedure - PC MACT Malfunction Abatement Plan - View
  • Raw Grind System - PC MACT Start-up/Shutdown/Malfunction Abatement Plan - View
  • FG Raw Materials - PC MACT Operation & Maintenance Plan - View
  • FG Raw Mill - PC MACT Operation & Maintenance Plan - View
  • Kiln Group 5 & 6 & Clinker Cooler Systems - PC MACT Start-up/Shutdown/Malfunction Abatement Plan - View
  • FG Kiln Group 5 & 6 - PC MACT Operation & Maintenance Plans - View
  • FG Clinker Cooler Systems - PC MACT Operation & Maintenance Plan - View
  • FG Clinker Systems - PC MACT Operation & Maintenance Plan - View
  • FG Cement Kiln Dust Handling System Operation & Maintenance Plan - View
  • FG Finish Mill & Storage & Loading System - PC MACT Start-up/Shutdown/Malfunction Abatement Plan - View
  • FG Finish Mills Systems - PC MACT Operation & Maintenance Plan - View
  • FG Cement Storage Loader Systems - PC MACT Operation & Maintenance Plan - View
  • FG Fuel Handling System Operation & Maintenance Plan- View

Marathon Petroleum Company LP - SRN:  A9831
The Department held a public comment period from November 2, 2011 until December 7, 2011 on proposed Permits to Install (PTIs) numbers 63-08C, 197-10A, 96-11, 142-11, and 148-11.  This comment period provides for future incorporation of the final PTIs into ROP No. 199700013c as administrative amendment.

  • 197-10A Draft Permit Terms and Conditions - View
  • 63-08C Draft Permit Terms and Conditions - View
  • 96-11 Draft Permit Terms and Conditions - View
  • 142-11 Draft Permit Terms and Conditions - View
  • 148-11 Draft Permit Terms and Conditions - View
  • Notice of Hearing - View
  • Fact Sheet - View
  • Company Letter for PTI 197-10A - View
  • Company Letter for PTIs 63-08C, 96-11, 142-11, and 148-11 - View
  • Interested Party Letter - View

Severstal Dearborn, LLC - SRN:  A8640
The Department held a public comment period from June 6, 2011 until July 6, 2011 on a draft renewal of the ROP.

  • Public Notice - View
  • Staff Report - View
  • Draft ROP - View
  • Fugitive Dust Plan - View
  • H2S Monitoring Plan Levy - View
  • H2S Monitoring Plan Severstal - View
  • MACT Plan for B Blast Furnace - View
  • MACT Plan for BOF - View
  • MACT Plan for C Blast Furnace - View
  • Scrap Management Plan - View
  • Start-up, Shutdown, Malfunction Abatement Plan - Ladle Refining #1 - View
  • Start-up, Shutdown, Malfunction Abatement Plan - Ladle Refining #2 - View

Detroit Edison Trenton Channel Power Plant - SRN:  B2811
The Department held a public comment period from May 23, 2011 until June 22, 2011 on a draft renewal of the ROP.

  • Public Notice - View
  • Staff Report - View
  • Draft ROP - View
  • Draft Compliance Assurance Monitoring Plan - View

Lansing Board of Water and Light, Eckert/Moores Park Stations - SRN: B2647
The Department extended the public comment period until December 15, 2010 on a draft renewal of the ROP.  A public hearing was held on December 15, 2010.

  • Public Notice - View
  • Staff Report - View
  • Draft ROP - View
  • Fugitive Dust Management Plan - View
  • Compliance Assurance Monitoring Plan - View
  • Malfunction Abatement Plan - View

The public comment period for initial or renewal ROPs has ended and the Department of Environmental Quality has proposed the following Renewable Operating Permits to the U.S. Environmental Protection Agency for approval:

Those individuals who commented on draft permits during the 30 day public notice period may send comments to the U.S. Environmental Protection Agency, Region 5, Permits and Grants Section, Mail Code AR 18J, 77 West Jackson Boulevard, Chicago, Illinois, 60604. The time period provided to petition the permit to EPA ends 60 days after EPA's 45-day review period ends (i.e., 105 calendar days after the specified start date of the EPA review).  See AQD's Rule 214(8) for further information.  Information is also provided regarding proposed actions that have gone directly to EPA review for modifications to existing ROPs.

Detroit Industrial Generation - SRN:  N6631
A proposed renewal of the ROP (EPA review started 1/31/2012).

  • Staff Report - View
  • Proposed ROP - View

Aleris International - SRN:  N5957
A proposed renewal of the ROP (EPA review started 1/27/2012).

  • Staff Report - View
  • Proposed ROP - View

Detroit Edison Company River Rouge Plant - SRN: B2810
A proposed renewal of the ROP (EPA review started 1/25/2012).

  • Staff Report - View
  • Proposed ROP - View

Morgan Olson, LLC - SRN:  N0879
A proposed renewal of the ROP (EPA review started 1/6/2012).

  • Staff Report - View
  • Proposed ROP - View

General Motors LLC, Lansing Grand River Assembly - SRN:  A1641
A proposed renewal of the ROP (EPA review started 1/4/2012).

  • Staff Report - View
  • Proposed ROP - View

The Department of Environmental Quality has recently made final decisions on the following Renewable Operating Permit Actions:

The time period provided to petition an initial or renewal permit to EPA ends 60 days after EPA's 45-day review period ends, (i.e., 105 calendar days after the specified start date of the EPA review).  See AQD's Rule 214(8) for further information.

All plans referenced in final ROPs can be obtained from the appropriate AQD District Office.

General Motors LLC - Warrent Transmission Plant - SRN:  B1798
Administrative Amendment of the ROP under Rule 336.1216(1)(a)(i)-(iv).

Vacuum Orna Metal, Inc. - SRN:  B4550
A renewal of the ROP (EPA review started 12/13/2011).

ANR Storage Company - SRN:  B7197
A renewal of the ROP (EPA review started 11/29/2011).

ANR Storage Company - SRN:  B7196
A renewal of the ROP (EPA review started 11/29/2011).

DTE Northeast Peaker Generating Units - SRN:  B2808
A renewal of the ROP (EPA review started 11/21/2011).

Delta Tube & Fabrication Corporation - SRN:  B6488
A renewal of the ROP (EPA review started 11/17/2011).

DTE Energy Harbor Beach Power Plant - SRN:  B2815
A renewal of the ROP (EPA review started 11/21/2011).

Orchard Hill Landfill - SRN:  N5719
A renewal of the ROP (EPA review started 11/10/2011).

Michigan Public Power Agency - SRN:  N7113
A renewal of the ROP (EPA review started 10/27/2011).

C & C Sanitary Landfill LLC - SRN:  N2896
A renewal of the ROP (EPA review started 10/27/2011).

Michigan Consolidated Gas - Kalkaska Compressor Station - SRN:  N3341
A renewal of the ROP (EPA review started 10/28/2011).

Lyons Industries, Inc. - SRN:  N5599
A renewal of the ROP (EPA review started 10/13/2011).

J.B. Sims Generating Station - SRN:  B1976
A renewal of the ROP (EPA review started 10/14/2011).

Rec Boat Holdings LLC, Sport and Engineering - SRN:  N1470
A renewal of the ROP (EPA review started 10/3/2011).

Rec Boat Holdings LLC, Cruiser - SRN:  N1328
A renewal of the ROP (EPA review started 10/3/2011).

Consumers Energy Northville - SRN:  N1099
A renewal of the ROP (EPA review started 10/11/2011).

United States Gypsum Company - SRN:  B3518
A renewal of the ROP (EPA review started 9/21/2011).

DuPont Mt. Clemens - SRN:  A3569
A renewal of the ROP (EPA review started 9/21/2011).

Detroit Edison Delray - SRN:  B2798
A renewal of the ROP (EPA review started 9/13/2011).

Magna Mirrors, Inc. - SRN:  N5056
A renewal of the ROP (EPA review started 9/6/2011).

Southeast Berrien County Landfill - SRN:  N5432
A renewal of the ROP (EPA review started 8/26/2011).

Detroit Edison Greenwood Energy Center - SRN:  B6145
A renewal of the ROP (EPA review started 8/2/2011).

Ford Motor Company - Automatic Transmission New Product Center - SRN:  M4734
A renewal of the ROP (EPA review started 8/2/2011).

Jaycor, Inc. - SRN:  N3418
A renewal of the ROP (EPA review started 8/5/2011).

Detroit Edison Company Colfax Peaker - SRN:  B2795
A renewal of the ROP (EPA review started 7/14/2011).

K & W Landfill, Inc. - SRN:  N6039
A renewal of the ROP (EPA review started 7/12/2011).

Fagerdala USA Marysville, Inc. - SRN:  N6944
An initial ROP (EPA review started 7/6/2011).

Ford Motor Company - Romeo Engine Plant - SRN:  B2869
A renewal of the ROP (EPA review started 7/19/2011).

Consumers Energy Company Thetford Combustion Turbine Plant - SRN: B2918
A reopening of the ROP (EPA review started 6/28/2011).

Detroit Renewable Power - SRN:  M4148
A renewal of the ROP (EPA review started 6/14/2011).

E.B. Eddy Paper, Inc. (d/b/a Domtar Industries, Inc.) - SRN:  B6420
A renewal of the ROP (EPA review started 6/22/2011).

Conway Products Corporation d/b/a Emerald Spa Corp. - SRN:  M3333
A renewal of the ROP (EPA review started 7/7/2011).

Westside Recycling and Disposal Facility - SRN:  N1216
A renewal of the ROP (EPA review started 6/16/2011).  

Consumers Energy B.C. Cobb Electric Generating Station - SRN: B2836
A renewal of the ROP (EPA review started 6/23/2011).

Day International - SRN:  B2014
A renewal of the ROP (EPA review started 5/12/2011).

Michigan Environs Inc. - SRN:  N6037
A renewal of the ROP (EPA review started 5/12/2011).

Sherwin Williams Co. - SRN:  B7711
A renewal of the ROP (EPA review started 4/20/2011).

Polytech Moulding Industries Inc. - SRN:  N7238
A renewal of the ROP (EPA review started 4/1/2011).

CMS Generating, Kalamazoo River Generating Station - SRN:  N6731
A renewal of the ROP (EPA review started 3/8/2011).

AAR Mobility System - SRN:  B4197
A renewal of the ROP (EPA review started 3/3/2011).

AutoAlliance International - SRN:  N0929
A renewal of the ROP (EPA review started 3/24/2011).

Technisand, Inc. - SRN:  A0367
A renewal of the ROP (EPA review started 2/18/2011).

Vector Pipeline, Athens Compressor Station - SRN:  N8151
An initial ROP (EPA review started 3/14/2011).

Hemlock Semiconductor Corporation - SRN:  B2644
A renewal of the ROP (EPA review started 3/9/2011).

The Dow Chemical Company - SRN: A4033
A renewal of the ROP (EPA review started 2/11/2011).

Michigan Sugar Company Bay City Plant - SRN: B1493
A renewal of the ROP (EPA review started 1/25/2011).

Detroit Edison Belle River/St. Clair - SRN: B2796
A reopening of the ROP (EPA review started 1/25/2011).

Forest Lawn Landfill - SRN: N2407
A renewal of the ROP (EPA review started 1/25/2011).

Quantum Composites, Inc. - SRN:  N6874
An initial ROP (EPA review started 1/24/2011).

Veolia Energy Grand Rapids, LLC - SRN:  B2838
A renewal of the ROP (EPA review started 1/6/2011).

Noron Composite Technologies, Inc. - SRN: N1864
A renewal of the ROP (EPA review started 12/28/2010).

Menominee Paper Company - SRN: B1855
A renewal ROP (EPA review started 12/1/2010).

Haworth, Inc. - SRN: N5569
A reopening of the ROP (EPA review started 12/9/2010).

  • Staff Report - View
  • Final ROP Reopening - View

Veolia-Arbor Hills Landfill - SRN:  N2688
A renewal of the ROP (EPA review started 12/13/2010).

Graphics Packaging International - SRN: B1534
A renewal ROP (EPA review started 11/29/2010).

Covalence Specialty Products - SRN: B2013
A renewal ROP (EPA review started 11/15/2010).

Aquatic Company - SRN: B2025
A renewal of the ROP (EPA review started 11/15/2010).

Hi-Tech Coatings, Inc - SRN: N5747
An initial ROP (EPA review started 11/5/2010).

Warren Wastewater Treatment Plant - SRN: B1792
A renewal of the ROP (EPA review started 11/4/2010).

ANR Pipeline Capac Compressor Station - SRN: B6481
A renewal of the ROP (EPA review started 11/4/2010).

Chrysler Jefferson North Assembly - SRN: N2155
A renewal of the ROP (EPA review started 11/4/2010).

Citizen's Disposal Incorporated - SRN: N5991
A renewal of the ROP (EPA review started 11/4/2010).

Chrysler Warren Truck Assembly - SRN: B2767
A renewal of the ROP (EPA review started 10/6/2010).

GM Flint Metal Center - SRN: B1608
A renewal of the ROP (EPA review started September 23, 2010).

DTE Pontiac North - SRN: N7786
A reopening of the ROP (EPA review started 9/30/2010).

Great Lakes Gas Transmission, Crystal Falls Compressor Station - SRN: N3760
A renewal of the ROP (EPA review started 10/14/2010).

Great Lakes Gas Transmission, Wakefield Compressor Station - SRN: N2168
A renewal of the ROP (EPA review started 10/14/2010).

Contact:  For ROP program information or Internet page technical issues contact Joanne Foy at 517-373-7033 or foyj@michigan.gov or Kirsten Clemens at 269-567-3548 or clemensk@michigan.gov .




Michigan.gov Home  |   DEQ_Home  |   Online Services  |   Permits  |   Programs  |   Site Map  |   Contact_DEQ
State Web Sites  |   Privacy Policy  |   Link Policy  |   Accessibility Policy  |   Security Policy

Copyright © 2001 - Present State of Michigan