Pending Permit to Install (PTI) Applications for
Coal-Fired Power Plants
The public comment period for the following PTI is now closed. For more information visit the NSR Public Notice Documents page (View). The information below will be updated as more information becomes available.
Project Manager: Vrajesh C. Patel, (517) 373-7053, PatelV@michigan.gov
Supervisor: Mary Ann Dolehanty, (517) 373-2098, DolehantyM@michigan.gov
___________________________________
Consumers Energy, Essexville, 48732
State
Registration No. B2840
|
Section |
Item Description |
Date Received |
|
|
|
PTI Form
and Letter |
10/2007 |
|
|
TOC |
Table of
Contents and Acronyms |
10/2007 |
|
|
1.0 |
Introduction: Site Description |
10/2007 |
|
|
2.0 |
Process
Description |
10/2007 |
|
|
3.0 |
Summary
of Emission Calculations |
10/2007 |
|
|
4.0 |
Summary
of Regulatory Requirements |
10/2007 |
|
|
5.0 |
Control
Technology Review |
10/2007 |
|
|
6.0 |
Ambient
Impact Analysis |
10/2007 |
|
|
7.0 |
Deposition
Modeling Summary |
10/2007 |
|
|
8.0 |
Human
Health Risk Assessment (HHRA)
Summary & Conclusion |
10/2007 |
|
|
9.0 |
Additional
Impact Analysis |
10/2007 |
|
|
Appendix
A |
Site
Drawings |
10/2007 |
|
|
Appendix
B |
Emission
Calculations |
10/2007 |
|
|
Appendix
C |
Process
Drawings |
10/2007 |
|
|
Appendix
D |
BACT |
10/2007 |
|
|
Appendix
E |
Dispersion
Modeling |
10/2007 |
|
|
Appendix F |
Deposition
Modeling |
10/2007 |
|
|
Appendix G |
Modeling |
10/2007 |
|
|
Appendix H |
HHRA |
10/2007 |
|
|
Appendix H |
HHRA |
10/2007 |
|
|
Appendix H |
HHRA |
10/2007 |
|
|
Appendix H |
HHRA |
10/2007 |
|
|
Appendix H |
HHRA |
10/2007 |
|
|
Appendix H |
HHRA |
10/2007 |
|
|
Appendix H |
HHRA |
10/2007 |
|
|
Appendix H |
HHRA |
10/2007 |
|
|
Appendix H |
HHRA |
10/2007 |
|
|
Appendix H |
HHRA |
10/2007 |
|
|
Appendix H |
HHRA |
10/2007 |
|
|
Appendix H |
HHRA |
10/2007 |
|
|
Appendix I |
Alternative
Technology Assessment |
10/2007 |
|
|
Revisions |
Revised
Section 6.9: Ambient Impacts of CO, NOx, and SO2 – Significant Impact
Levels (SIL) and Revised Section 9.6:
Cooling Tower Impacts |
|
|
|
|
Additional TAC Modeling |
3/24/08 |
|
| Revision | Revised Appendix H (Zipped PDFs) | 4/10/2008 | |
| Amendment | Top-Down BACT Analysis for IGCC | 4/10/2008 | |
| Amendment | 112(g) Case-by-Case MACT Analysis for the Proposed ASCPC Boiler | 5/7/2008 | |
| Revisions | Revised Appendices B, C, D, E & I; Revised Section 6 (Zipped PDFs) | 5/8/2008 | |
| Legend | PC Fired Unit Piping and Instrumentation Diagram Legend | 5/14/2008 | |
| Revision | Updated 112(g) Case-by-Case MACT Analysis for the Proposed ASCPC Boiler | 7/21/2008 | |
| PM-10 BACT Limit Justification | 7/31/2008 | ||
| Amendment | 112(g) Analysis for the Auxiliary Boiler | 8/5/2008 | |
| Letter | Response to Comments - 112(g) Case-by-Case MACT Analysis | 8/18/2008 | |
| Revision | HCl Emissions Estimates | 8/18/2008 | |
| Modeling Inputs | 8/18/2008 | ||
| Revisions | Updated 112(g) Case-by-Case MACT Analysis for the Proposed ASCPC Boiler | 8/26/2008 | |
| Letter | Case-by-Case MACT Analysis Revision | 10/28/2008 | |
| Revision | Updated 112(g) Case-by-Case MACT Analysis for the Auxiliary Boiler | 10/28/2008 | |
| Revision | Updated 112(g) Case-by-Case MACT Analysis for the Proposed ASCPC Boiler | 10/28/2008 | |
| Revision | Consumers Revised MACT Appendix J Final | 12/22/2008 | |
| Revision | Consumers Energy Revisions (January 12, 2009) | 1/13/2009 | |
|
Revision |
Revised Table of
Contents and Acronyms |
2/4/2009 | |
| Revision | Section 3 - Summary of Emission Calculations Revised | 2/4/2009 | |
| Revision | Section 5 Revisions | 2/4/2009 | |
| Revision | Wind Erosion Calculations for Reserve Storage Pile | 2/4/2009 | |
| Revision | Wind Erosion Calculations for Reserve Stockout Pile | 2/4/2009 | |
| Revision | Description of Wind Erosion Calculations - Revised | 2/4/2009 | |
| Letter | Consumers Alternatives Analysis Request Letter | 4/7/2009 | |
| Letter | Consumers Alternatives Analysis Request Letter | 5/13/2009 | |
| Letter | Consumers Alternatives Analysis Request Letter | 6/2/2009 | |
| Analysis | Consumers Alternatives Analysis | 6/5/2009 | |
| Analysis | Supporting Data - Electric Generation Alternatives Analysis (EGAA) | 6/22/2009 | |
| Analysis | Section 5 - Revised BACT Analysis | 8/11/2009 | |
| Memo | Cooling Tower Quality | 10/13/2009 | |
| Letter | Additional Information on PM10 Surrogacy Policy and MACT Analysis | 11/6/2009 |