Permit to Install (PTI) Applications for
Coal-Fired Power Plants

The following PTI application was approved by the DEQ on June 29, 2011.  For more information visit the NSR Public Notice Documents page (View).  The information below will be updated as more information becomes available.

___________________________________

Wolverine Power Supply Cooperative, Inc., Rogers City / Roger Township

State Registration No. N7867
PTI Application No. 317-07
Permit Engineer:  Melissa Byrnes, (517) 373-7065,
ByrnesM@michigan.gov

Section

Item Description

Date Received

 

Cover & Table of Contents

Start of Volume 1; Cover & Table of Contents

1/10/2008*

View

1

Introduction & Project Description

1/10/2008*

View

2

Need for Project

1/10/2008*

View

3

Summary of Project Emissions

1/10/2008*

View

4

Analysis of Applicable Federal & State Requirements

1/10/2008*

View

5

BACT & T-BACT

1/10/2008*

View

6

Air Quality Impact Analysis

1/10/2008*

View

7

Additional Impacts Analysis

1/10/2008*

View

Figures 1 - 6 Figures

1/10/2008*

View

Tables 3.1 - 6.20 Tables

1/10/2008*

View

Appendix 1 Reference Drawings SKC107 & SKC108

1/10/2008*

View

Appendix 2 Fuel Supply & Fuel Section Study

1/10/2008*

View

Appendix 3 Technology Selection Study

1/10/2008*

View

Appendix 4 Systems Descriptions

1/10/2008*

View

Appendix 5 Balance of Plant Equipment Description & Corresponding Emissions Data

1/10/2008*

View

Appendix 6 Power Cooperative Map

1/10/2008*

View

Appendix 7 Emission Data Reference Sheet

1/10/2008*

View

Appendix 8 Proccess Controls & Rentech Reference Documents

1/10/2008*

View

Appendix 9 Estimated Emissions Tables

1/10/2008*

View

Appendix 10 Emissions Calculation Sheets

1/10/2008*

View

Appendix 11 RBLC Results

1/10/2008*

View

Appendix 12 BACT Analyses

1/10/2008*

View

Appendix 13 Generating Technology Comparison & Emission Calculations

1/10/2008*

View

Appendix 14 IGCC Cost Info

1/10/2008*

View

Appendix 15 Start of Volume 2; BPIP Input & Output

1/10/2008*

View

Appendix 16 Model Summary

1/10/2008*

View

Appendix 17 Model Results

1/10/2008*

View

Appendix 18 Waiver Request

1/10/2008*

View

Appendix 19 Model Results

1/10/2008*

View

Appendix 20 Model Results

1/10/2008*

View

Appendix 21 Model Results

1/10/2008*

View

Appendix 22 Building List

1/10/2008*

View

Appendix 23 BPIP Input & Output

1/10/2008*

View

Appendix 24 Emission Calculation Sheets

1/10/2008*

View

Appendix 25 AERMOD Input & Output

1/10/2008*

View

Appendix 27 BPIP Input & Output

1/10/2008*

View

Appendix 28 Air Toxic Evaluation Model Results

1/10/2008*

View

Appendix 29 Model Results

1/10/2008*

View

Appendix 30 Rule 228 Analysis for Mercury Emissions

1/10/2008*

View

Appendix 31 AERMOD Input & Output

1/10/2008*

View

Addendum to Appendix 12-14 Background Documentation for IGCC BACT Analysis, 1 of 4 2/6/2008 View
Addendum to Appendix 12-14 Background Documentation for IGCC BACT Analysis, 2 of 4 2/6/2008 View
Addendum to Appendix 12-14 Background Documentation for IGCC BACT Analysis, 3 of 4 2/6/2008 View
Addendum to Appendix 12-14 Background Documentation for IGCC BACT Analysis, 4 of 4 2/6/2008 View
  Response to Additional Information Request 2/25/2008 View
  Response to Additional Information Request 4/17/2008 View
Appendix 26 Class I Area Impact Analysis (Rev. 4/2008)

4/25/2008

View

  Response to Additional Information Request 5/9/2008 View
  Dispersion Modeling Protocol (ZIP) 5/15/2008 View
Addendum to Appendix 26 Class I Area Impact Analysis (Rev. 6/2008)

6/12/2008

View

  Response to Additional Information Request 7/24/2008 View
Supplement

Ancillary Equipment Emission Rates

8/7/2008

View

Supplement

WCEV Revised Responses to 112(g) for Acid Gases & Organic HAPs (ZIP)

8/8/2008

View

Supplement

WCEV Revised Response to 112(g) for Auxiliary Boiler (ZIP)

8/13/2008

View

Supplement

WCEV Request to Revise PPH VOC Limit (ZIP)

8/13/2008

View

Supplement

Lead Removal Efficiency Calculations

8/15/2008

View

Supplement

BACT Analysis

8/15/2008

View

Supplement

Fuel Oil Storage Tank

8/15/2008

View

Additional Info

E-Mail RE: Proposed BACT Limit for Lead Background Info

8/15/2008

View

Supplement

TAC Start-Up Emissions

8/15/2008

View

Supplement

Revised Misc. Material Handling Emission Limits

8/15/2008

View

Supplement

Supplement to CAA Section 112(g) MACT Auxiliary Boiler - Amended

8/15/2008

View

Supplement

E-Mail RE: Maximum Biomass Firing Rate

8/15/2008

View

Supplement

WCEV Fuel Oil Storage Tank Additional Information (ZIP)

8/15/2008

View

Supplement

Supplement to CAA Section 112(g) MACT Mercury - Amended

8/18/2008

View

Supplement

WCEV Mercury Emission Calculation

8/21/2008

View

Supplement

E-Mail RE: WCEV Auxiliary Boiler 112g Supplemental Information

8/29/2008

View

Supplement

Rule 228 Analysis for Mercury Emissions

9/5/2008

View

Supplement

Revised Rule 228 Analysis for Mercury Emissions

9/12/2008

View

Supplement

WCEV Revised Tables 6-17 & 6-18 (ZIP)

9/15/2008

View

AQD Analysis

Wolverine Toxics Analyses (ZIP)

9/17/2008

View

Supplement

WCEV Dioxin & Furan Calculations Supplemental Information (ZIP)

9/17/2008

View

Supplement

WCEV Updated Top-Down BACT & Modeling Analyses (ZIP)

9/30/2008

View

AQD Analysis

Wolverine Modeling Analyses (ZIP)

12/3/2008

View

Letter Wolverine Alternatives Analysis Request Letter

4/7/2009

View

Analysis Wolverine Alternatives Analysis

6/8/2009

View

Letter Response to Comments - PM2.5 Limits

6/22/2009

View

Letter Response to Comments - BACT Analysis

6/22/2009

View

Supplement PM2.5 Supplement Information

7/27/2009

View

Analysis PM2.5 Modeling Analysis

7/29/2009

View

Supplement Supplement to BACT & Fuel BACT Analyses

8/17/2009

View

Additional Info Intermediate Load BACT

11/13/2009

View

Addendum Modeling Protocol Addendum

2/28/2011

View

Analysis Greenhouse Gas (GHG) BACT Analysis

3/16/2011

View

Supplement GHG BACT Supplement Information

4/5/2011

View

Supplement GHG BACT Supplement Information Memo

4/6/2011

View

* The original application and information was received on 9/26/2007. Additional information was submitted on 1/10/2008 and incorporated into the original submittal. The information posted on this web site is the updated application and information.